Description:
Project: Production Hall
Area: 52,535 Sft
Location: PIA, PEC, Karachi
Jazari steel has successfully completed the project of production hall in space frame structure.
Designed Clear Span Space Frame structure meticulously over 52,535 Sft.
Advantages:
cost-effectiveness, speed of construction, and flexibility in design.
2023 © Jazari Steel | All Rights Reserved
WhatsApp us